Environmental Impact Assessment
Who is concerned?
Any industrial, mining, agricultural, or infrastructure project owner whose project appears on the list of works subject to EIE is legally required to produce this study prior to obtaining their construction or operating permit.

Initial site assessment
Inventory of environmental components: physical, biological, human, and landscape settings. Data collected on-site and from secondary sources.
Impact analysis
Identification, qualification, and prioritization of direct and indirect impacts of the project on environmental components. Temporary and permanent impacts.
Mitigation measures
Definition of suppression, reduction, and compensation measures for significant impacts. Each measure is costed and scheduled.
Monitoring program
Environmental monitoring indicators, control frequency, alert thresholds, and reporting procedures to the Ministry of Environment.
A structured EIE report, compliant with the Algerian regulatory framework, ready for submission to the Wilaya Department of the Environment (DEW) and the Directorate of Industry and Mines (DIM).
As soon as your project appears on the regulatory list of works subject to impact assessment (executive decree No. 07-145). The EIE is a prerequisite for obtaining a construction or operating permit.
Depending on the scale and sensitivity of the site, it can take from a few weeks to several months. We define the timeline from the initial consultation.
The wilaya authorities — the Wilaya Department of the Environment (DEW) and the Directorate of Industry and Mines (DIM).
Does your project require an EIE?
Send us the technical details of your project. We assess the scope of the study and provide you with a quote within 48 hours.